ISO 9001, Six Sigma, ASQ Exam Preparation and data analysis courses are on sale up to 75% off.
See the list of courses here. https://www.qualitygurus.com/udemy-courses/
0 of 10 Questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
0 of 10 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Average score | |
Your score |
If the objective is maximize the quality production by ensuring production machine availability and reducing machine breakdowns, which of the following lean tool will best work for this?
If it takes 20 minutes to make 10 piece, what will be the takt time?
In calculating OEE (Overall Equipment Effectiveness) what will be the quality factor, if in 8 hours shift the machine needed adjustment and 1 hour was lost in that.
What is an Andon Board?
What is the target setup time in SMED (Single Minute Exchange of Die)?
Which of the following is Muda?
Which of the following is the first step in the 5S approach?
A rapid improvement effort designed to produce results within a few days is called:
An activity that is wasteful and doesn’t add value or is unproductive is called:
Single Minute Exchange of Dies (SMED) focuses on setup reduction. Which of the following are components of a setup or a changeover?