Lean Manufacturing Quiz
Quiz Summary
0 of 10 questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 10 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Average score |
|
Your score |
|
Categories
- Not categorized 0%
- Lean 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 10
1. Question
If the objective is maximize the quality production by ensuring production machine availability and reducing machine breakdowns, which of the following lean tool will best work for this?
CorrectIncorrect -
Question 2 of 10
2. Question
If it takes 20 minutes to make 10 piece, what will be the takt time?
CorrectIncorrect -
Question 3 of 10
3. Question
In calculating OEE (Overall Equipment Effectiveness) what will be the quality factor, if in 8 hours shift the machine needed adjustment and 1 hour was lost in that.
CorrectIncorrect -
Question 4 of 10
4. Question
What is an Andon Board?
CorrectIncorrect -
Question 5 of 10
5. Question
What is the target setup time in SMED (Single Minute Exchange of Die)?
CorrectIncorrect -
Question 6 of 10
6. Question
Which of the following is Muda?
CorrectIncorrect -
Question 7 of 10
7. Question
Which of the following is the first step in the 5S approach?
CorrectIncorrect -
Question 8 of 10
8. Question
A rapid improvement effort designed to produce results within a few days is called:
CorrectIncorrect -
Question 9 of 10
9. Question
An activity that is wasteful and doesn’t add value or is unproductive is called:
CorrectIncorrect -
Question 10 of 10
10. Question
Single Minute Exchange of Dies (SMED) focuses on setup reduction. Which of the following are components of a setup or a changeover?